Realizations

Grota-Roweckiego bridge in Warsaw

Complete reconstruction of the bridge including its extension, equipment (bearings, expansion joints, prestressing) and a test load.

Grota-Roweckiego bridge is part of the S8 expressway from Wrocław through Warsaw to Białystok. It is the most heavily loaded bridge in Poland, with over 200,000 vehicles driving daily.

Grota-Roweckiego bridge in Warsaw

Tauron Arena Kraków entertainment and sports hall

Design, delivery and execution of the tension structure with purlins of the main hall roof as well as design and delivery of technical platforms. 

Tauron Arena Kraków entertainment and sports hall

S7 expressway

Complete construction of the following structures on the S7 expressway from Ostróda Północ to Ostróda Południe:

  • MS-6: two-section prestressed concrete viaduct, 550 m long,
  • MS-2: prestressed concrete viaduct, 339 m long,
  • WD-21: arched viaduct with a span of 70 m,
  • DPG-33: crossing for animals in a soil-shell structure.


Delivery and assembly of 1,874 bearings and 656 m of expansion joints on the S7 expressway from Pasłęk Południe to Rychnowo.

 

S7 expressway

Cosmopolitan building in Warsaw

Delivery and assembly of steel truss elements and hangers anchors for a 160-meter residential building.

Cosmopolitan building in Warsaw

S17 expressway from Warszawa to Lublin

Delivery and assembly of a total of 1,561 bridge bearings and 5,210 m of expansion joints on the S17 expressway from "Warszawa Lubelska" junction to "Piaski Wschód" junction.

S17 expressway from Warszawa to Lublin

Warsaw Cross-City Line

Construction of a steel railway viaduct with a span of 20 m, located at km 2 + 280 of the railway line No. 23 in Warsaw.

Warsaw Cross-City Line

S3 expressway

Delivery and assembly of bridge bearings (515 pcs.) and expansion joints (753 m) for the S3 expressway from Międzyrzecz to Gorzów Wielkopolski.

S3 expressway

The castle-manor complex in Liw

Construction of a wooden footbridge to the castle tower.

The castle-manor complex in Liw

Czerniakowska junction in Warsaw

Replacement of modular expansion joints with B2P finger expansion joints, with a total length of 20 m. Completed within 8 days, without the need to completely close traffic.

Czerniakowska junction in Warsaw

Szczecin Rapid Tram

Supply of pot bearings, supply and assembly of modular expansion devices for viaduct over fast tram line and footbridge over DK10 national road in Szczecin

Szczecin Rapid Tram